home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V13_4 / V13_465.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/sc5wHW600WBwI2o05s>;
  5.           Fri, 26 Apr 91 02:12:50 -0400 (EDT)
  6. Message-ID: <cc5wHQ-00WBwI2mE53@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Fri, 26 Apr 91 02:12:44 -0400 (EDT)
  12. Subject: SPACE Digest V13 #465
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 465
  15.  
  16. Today's Topics:
  17.                Re: Saturn V and the ALS
  18.      Re: slight problems with HLV's in general, Saturn or not...
  19.                Re: Saturn V blueprints
  20.            Charting a decade of the Shuttle
  21.            Re: Uploading to alpha Centauri
  22.                Re: Saturn V blueprints
  23.                Re: Saturn V blueprints
  24.           Re: Atlas Centaur bites the big one, 4/18
  25.  
  26. Administrivia:
  27.  
  28.     Submissions to the SPACE Digest/sci.space should be mailed to
  29.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  30.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  31.              tm2b+@andrew.cmu.edu
  32.  
  33. ----------------------------------------------------------------------
  34.  
  35. Date: 25 Apr 91 13:55:45 GMT
  36. From: mnemosyne.cs.du.edu!isis!gaserre@uunet.uu.net  (Glenn A. Serre)
  37. Subject: Re: Saturn V and the ALS
  38.  
  39. In article <1991Apr24.202121.13194@en.ecn.purdue.edu> irvine@en.ecn.purdue.edu writes:
  40.  
  41.    ...
  42.  
  43.    Not magically appear, I think NASA has been committing(sp?) resources
  44.    to the shuttle at the expense of other systems.  Now that they can, we
  45.    have ALS!
  46.  
  47. This last sentence isn't too clear.  Are you saying that NASA can move
  48. resources from the Shuttle to ALS developement?
  49.  
  50.    ...
  51.  
  52.    I think the stagnation of launcher technology is more of a refusal
  53.    of NASA to use anything other than the shuttle for launches. (Until
  54.    recently)
  55.  
  56. Air Force launch technology is pretty stagnant, too.  I'd have to agree with
  57. Henry that it's due more to the fact that all launches are operational.  
  58.  
  59.    > *not* have to debug the design significantly.  For example, we know the
  60.    > engines run reliably without serious combustion instability... and that
  61.    > is several years' development bypassed right there.
  62.  
  63.    BUT, engines could be made that burn less fuel and therefore lift
  64.    even more to orbit.  Maybe rocketdyne could modify the F-1 to
  65.    bring it up to date.
  66.  
  67. This is how we got the SSMEs.  Increasing performance does not decrease
  68. cost, nor does it increase reliability (neccessarily).  The Saturn V could
  69. lift plenty of weight (mass, whatever) to orbit: 265,000 pounds.  
  70.  
  71.  
  72.    > >You just said that you'd need to revise the drawings and retest, etc. 
  73.    > 
  74.    > No I didn't.  Please read what I wrote.  We have to figure out how to make
  75.    > it again; we don't have to figure out what to make.
  76.    >
  77.    Unfortunately, this can be just as expensive.  
  78.    I am not trashing the idea of using good ideas from Saturn V, just that
  79.    resurrection of the Saturn V may be a big boondoggle.  For instance,
  80.    the avionics would have to be completely redone, the matereals would
  81.    or should be made lighter, and the engine technology should be brought
  82.    up to date (less fuel = more lifting power).  
  83.  
  84. I disagree completely.  The materials do NOT need to be made lighter.  The 
  85. Saturn V worked as designed.  The F-1 engines were low-pressure, high-thrust,
  86. and they worked reliably.  Maybe if we had been building and using F-1s since
  87. the Apollo days, they would now be somewhat improved, but we scrapped the 
  88. tried and true Saturn for the complex, high-performance Shuttle and its
  89. SSMEs.  
  90.  
  91.    -- 
  92.    +-----------------------------------------------------------------------+
  93.    | Brent L. Irvine     |            These are MY opinions   |
  94.    | Malt Beverage Analyst     |            As if they counted...:) |
  95.    +-----------------------------------------------------------------------+
  96. --
  97. --Glenn Serre         |Soon-to-be former Payload Integration Engineer for 
  98. gaserre@nyx.cs.du.edu |Martin Marietta Aerospace Group, Space Launch System
  99.                       |Company.  
  100.                       |Next job:  Script writer for Cayenne Systems, Inc.
  101. --
  102. --Glenn Serre         |Soon-to-be former Payload Integration Engineer for 
  103. gaserre@nyx.cs.du.edu |Martin Marietta Aerospace Group, Space Launch System
  104.                       |Company.  
  105.                       |Next job:  Script writer for Cayenne Systems, Inc.
  106.  
  107. ------------------------------
  108.  
  109. Date: 25 Apr 91 23:50:20 GMT
  110. From: sun-barr!newstop!exodus!concertina.Eng.Sun.COM!fiddler@apple.com  (Steve Hix)
  111. Subject: Re: slight problems with HLV's in general, Saturn or not...
  112.  
  113. In article <29852@rouge.usl.edu> dlbres10@pc.usl.edu (Phil Fraering) writes:
  114. >
  115. >Is a heavy-lift launch vehicle really needed? The vast majority of
  116. >commercial payloads are rather small compared to the payloads of the
  117. >large vehicles being developed, and I suspect that it would be easy to
  118. >break up the larger payloads into smaller payloads assembled on-site
  119. >if the smaller vehicle proved cheaper.
  120.  
  121. 1.  We already have medium and light launchers (not that they couldn't
  122.     be made cheaper and more cost effective).  And mayhap current commercial
  123.     payloads are sized to fit these existing launchers 'cause if they aren't
  124.     the only game in town, waiting for the shuttle is a pain. (And now no
  125.     commercial launches from the shuttle now, right?)
  126.  
  127. 2.  Very large payloads are, in part, nonexistent because of the nonexistent
  128.     launchers to toss them overhead.
  129.  
  130. 3.  Some big projects could reasonably be done with *big* launchers, while
  131.     breaking them up into parcels of smaller packages (to be assembled later?)
  132.     may turn out to be less than delightful.
  133.  
  134.  
  135.  
  136. --
  137. ------------
  138.   The only drawback with morning is that it comes 
  139.     at such an inconvenient time of day.
  140. ------------
  141.  
  142. ------------------------------
  143.  
  144. Date: 25 Apr 91 15:11:06 GMT
  145. From: snorkelwacker.mit.edu!think.com!zaphod.mps.ohio-state.edu!rpi!news-server.csri.toronto.edu!utzoo!kcarroll@bloom-beacon.mit.edu  (Kieran A. Carroll)
  146. Subject: Re: Saturn V blueprints
  147.  
  148. aws@iti.org (Allen W. Sherzer) writes:
  149.  
  150. > >Summary:  Fixed price for Procurement = good.
  151. > >         Fixed price for Development = foolish.
  152. > The Pentagon wouldn't agree. Nither would Lockheed which just
  153. > developed the winning ATF design on cost and on schedule. Their
  154. > Skunk Works has developed the worlds most complex aircraft in
  155. > short order on schedule and budget. It takes good management but
  156. > > it is routinely done.
  157.  
  158. I saw a show on PBS a few nights ago (may have been the McNeil/Lehrer
  159. Newshour) talking about the ALS development and fly-off competition.
  160. It was indeed done under fixed price contracts, of about $600M
  161. as I recall. However, apparently >both< prime contractors spent
  162. more like $1B each on the project. I don't know about the schedule,
  163. but they blew the budget significantly...according to Norman Augustine,
  164. only 25% of the 81 major programs that he studied (in Chapter 37 of 
  165. the revised version of "Augustine's Laws", 'Hope Springs Infernal') 
  166. exceeded their proposed budget by more than this fraction (67%).
  167.  
  168. This doesn't necessaarily reflect on the management of the programs, 
  169. by the way. It >may< have been a calculated business risk.
  170. Both companies would likely have been willing to take this risk,
  171. given the size of the production contract that they stood to win
  172. if their design was chosen by the USAF. So, the loser has to swallow
  173. a $400M marketing cost... 
  174. -- 
  175.  
  176.      Kieran A. Carroll @ U of Toronto Aerospace Institute
  177.      uunet!attcan!utzoo!kcarroll kcarroll@zoo.toronto.edu
  178.  
  179. ------------------------------
  180.  
  181. Date:         Thu, 25 Apr 91 11:51:33 EDT
  182. From: "Wm. L. Ranck" <RANCK@VTVM1.CC.VT.EDU>
  183.  
  184. Hello folks,
  185.    I've been reading the Saturn V vs. ALS discussion for a few days now
  186. and I've decided to toss in my 2 cents worth.  I will land firmly on both
  187. sides of this fence.
  188.    First I find Michael Kent's signature line especially ironic.  Here is
  189. a person saying how the old technology of Saturn V is not worth reviving
  190. and new is better, with a signature line that says 'Apple II forever!'.
  191. Am I the only one that finds this funny?
  192.    Next, since Henry Spencer brought up the 747 let's talk about that.
  193. There is some 1960s technology that is still being built, still going
  194. strong and doesn't really show signs of being 'retired' anytime soon.
  195. Of course the flip side of that coin is that Boeing bet their entire
  196. company on that project back in the 60s.  They built a whole new factory
  197. to build a whole new aircraft that they had to sell a bunch of to ever
  198. hope to recover their costs.  This was done without any written contracts
  199. in hand.  This says a *lot* for private industry developing commercial
  200. products.  This was not a military or government project.
  201.    If the 747 is still being built with upgraded avionics and materials
  202. then why not a Saturn V?  Surely the pieces that would have to be
  203. replaced because they are no longer available would have smaller and
  204. lighter counterparts.  It's not like you would have to make extra room
  205. for the components.  Yes it would take some engineering, but I'm never
  206. very convinced by people who say 'evryone who knew how to build that is
  207. either dead or retired, we can't possibly learn how to build it again'.
  208. Give me a break, people learned how to do it the first time so relearning
  209. the process is certainly possible.
  210.    So, I would say that it is possible to build a totally new vehichle and
  211. get it right and have a good system.  But, it would also be possible to
  212. recreate the old system with some updates and make that work.  Which
  213. should we do?  I don't know enough to form an opinion, but then neither
  214. does Congress though that never stops them.
  215.  
  216. Bill Ranck
  217. (speaking strictly for myself.)
  218.  
  219. ------------------------------
  220.  
  221. Date: 25 Apr 91 19:46:46 GMT
  222. From: aio!vf.jsc.nasa.gov!kent@eos.arc.nasa.gov
  223. Subject: Charting a decade of the Shuttle
  224.  
  225. -- 
  226.  
  227. Mike Kent -      Lockheed Engineering and Sciences Company at NASA JSC
  228.         2400 NASA Rd One, Houston, TX 77058 (713) 483-3791
  229.         KENT@vf.jsc.nasa.gov
  230.  
  231. ------------------------------
  232.  
  233. Date: 25 Apr 91 15:33:58 GMT
  234. From: sun-barr!olivea!samsung!caen!uwm.edu!csd4.csd.uwm.edu!markh@apple.com  (Mark William Hopkins)
  235. Subject: Re: Uploading to alpha Centauri
  236.  
  237. In article <1991Apr22.152222.1@dev8a.mdcbbs.com> rivero@dev8a.mdcbbs.com writes:
  238. >Let's say that the folks on Alpha refreeze, rescan, and retransmit one of the
  239. >crew back to Earth.
  240. >Let's say that this third generation copy arrives back on Earth and meets the
  241. >original crewman ( who, for the sake of this experiment, stayed in his freezer
  242. >for the 8.5 year round trip).
  243. >Question. Which one gets to go home and sleep with the wife?
  244.  
  245. Why, both of course. Technically, she's still only married to one man. :)
  246.  
  247. >If you believe in an immortal soul, do both of them now have one?
  248.  
  249. Both.  In fact they same the *same* soul, because they are one.
  250. In fact, there's only one soul in the entire Universe (mine), and that which
  251. you call your soul is merely a manifestation of mine.
  252.  
  253. (Of, course given that, then what is mine is yours, so you may make the same
  254. claim)
  255.  
  256. ------------------------------
  257.  
  258. Date: 25 Apr 91 22:42:45 GMT
  259. From: zaphod.mps.ohio-state.edu!caen!ox.com!hela!aws@uunet.uu.net  (Allen W. Sherzer)
  260. Subject: Re: Saturn V blueprints
  261.  
  262. In article <00947AA7.AEE5CD00@KING.ENG.UMD.EDU> sysmgr@KING.ENG.UMD.EDU (Doug Mohney) writes:
  263.  
  264. >>No this is on budget as well as schedule. Unlike other fighter
  265. >>competitions this time the Air Force required significant buy
  266. >>in by the contractors. Both where expected to put up about half
  267. >>the development money. In fact, they may have come in a tad under
  268. >>budget.
  269.  
  270. >You are incorrect. They put in MUCH more than half the development money. 
  271.  
  272. I would be interested in your sources. When the contract was awarded
  273. my department was working on computers which eventually ended up in ATF.
  274. My project was sub to McAir and many of those people worked their ATF
  275. proposal and negitiations with Northrup. The numbers I saw then on both
  276. total cost and contractor share where in agreement with what I and others
  277. have posted.
  278.  
  279. >The losing contractor (as I previously mentioned and which 
  280. >you chose to ignore) lost lots of money, 
  281.  
  282. I didn't 'chose to ignore' it. It is perfectly obvious that the losing
  283. contractor lost lots of money so there was no need to comment on it. this
  284. also happens in the commercial world. Douglas aircraft spent huge amounts
  285. of money on the MD-11 and is now nearly broke because of it. Northrup
  286. lost one billion $$ on the F-20. GD spent half a billion on commercial
  287. Atlas and may lose most of that as well.
  288.  
  289. Perhaps the Air Force will pick up more of the tab in the future but
  290. this time the Air Force's more commercial acquisition process seems to
  291. have worked for ATF development.
  292.  
  293.  
  294. >from a commercial good. The producers of the ATF have a locked-in monopoly; 
  295. >there is no 40/60 split of goods, as with certain second-sourcing of missiles.
  296.  
  297. There are still many many flaws in the military procurement system. This is
  298. one of them. That doesn't mean that the development wasn't done right.
  299.  
  300. >The winning contractor will recoup the expenses of his investment through
  301. >selective bookkeeping and profits over the years, 
  302.  
  303. Selective bookeeping is an open question. As to profits, of course they will
  304. recoup their development expenses. What's wrong with that?
  305.  
  306. >with no incentive to hold
  307. >prices down, other than the threat of Congress cancelling/ordering fewer planes
  308. >in the future. 
  309.  
  310. Ah! But with ATF prices that is a very real threat!
  311.  
  312. >Using the military as an "example" of proper procurement and estimation is a
  313. >VERY VERY poor example. I suggest you look up the cases of the C-5, B-1, and
  314. >B-2. Oops, forget the A-12, but it was cancelled. 
  315.  
  316. This thread started because people where questioning the ability of
  317. engineers to accurately predict the development costs of things like
  318. Saturn V's (or ATF's). I use the military BECAUSE they have a dismal
  319. record but one that can be improved with better procurement.
  320.  
  321.    Allen
  322. -- 
  323. +-----------------------------------------------------------------------------+
  324. |Allen W. Sherzer | If you love something, let it go. If it doesn't come back |
  325. |   aws@iti.org   | to you, hunt it down and kill it.                         |
  326. +-----------------------------------------------------------------------------+
  327.  
  328. ------------------------------
  329.  
  330. Date: 25 Apr 91 23:41:30 GMT
  331. From: usc!cs.utexas.edu!sun-barr!newstop!exodus!concertina.Eng.Sun.COM!fiddler@apple.com  (Steve Hix)
  332. Subject: Re: Saturn V blueprints
  333.  
  334. In article <00947AA7.AEE5CD00@KING.ENG.UMD.EDU> sysmgr@KING.ENG.UMD.EDU (Doug Mohney) writes:
  335. >
  336. >Using the military as an "example" of proper procurement and estimation is a
  337. >VERY VERY poor example. I suggest you look up the cases of the C-5, B-1, and
  338. >B-2. Oops, forget the A-12, but it was cancelled. 
  339.  
  340. You should probably make that "government procurement and estimation performance"
  341. rather than just "military...".
  342.  
  343. Pick your agency.
  344.  
  345.  
  346.  
  347.  
  348. --
  349. ------------
  350.   The only drawback with morning is that it comes 
  351.     at such an inconvenient time of day.
  352. ------------
  353.  
  354. ------------------------------
  355.  
  356. Date: 25 Apr 91 14:24:13 GMT
  357. From: aio!vf.jsc.nasa.gov!kent@eos.arc.nasa.gov
  358. Subject: Re: Atlas Centaur bites the big one, 4/18
  359.  
  360. In article <1991Apr24.131740.12778@iti.org>, aws@iti.org (Allen W. Sherzer) writes:
  361. > In article <1991Apr23.124023.21759@cs.ruu.nl> jprlarib@cs.ruu.nl (Jan Peter Laribij) writes:
  362. >>Politely ask how the Russians did it ;-)
  363. > We already know. Their approach is to use what works and to improve it step
  364. > wise as time goes on. They never use anything unless it is well understood
  365. > and poroven.
  366. > We on the other hand, do the opposite. We throw out all our technology
  367. > about every ten years and start over. As a result, we never get any
  368. > experience with anything.
  369.  
  370. I disagree with you.  The Russian protron booster has a launch success
  371. percentage LOWER than any US booster.  I do not have the specific figures, but
  372. our boosters: Atlas, Delta, Titan, Saturn, Shuttle  have launch successes in
  373. the high 90's.  The Russian boosters are in the low 90's
  374.  
  375. As far as throwing out our technology every ten years:
  376.  
  377. The Atlas has been in continous use for over 25 years.  The titan was developed
  378. in the 1960's and has been continously improved over the years.
  379.  
  380. All of our unmanned boosters have gone thru weight reduction programs,
  381. component replacement programs (new parts to replace ones that are not
  382. available any more), and major upgrades. 
  383.  
  384. In my opinion, NASA was faced with the undesireable choice of continuing the
  385. Saturn 5 or developing the Shuttle.  I think NASA made the right decision.
  386.  
  387. -- 
  388.  
  389. Mike W. Kent -  Lockheed Engineering and Sciences Company at NASA JSC
  390.         2400 NASA RD One, Houston, TX 77058 (713) 483-3791
  391.                 KENT@vf.jsc.nasa.gov
  392.  
  393. ------------------------------
  394.  
  395. End of SPACE Digest V13 #465
  396. *******************
  397.